We are delighted to collaborate with a wide range of clients from various industries. Hopefully, you will soon join them.
Chynorany Wastewater Treatment Plant
The current technological equipment of the Chynorany Wastewater Treatment Plant does not meet the required parameters. Therefore, the municipality of Chynorany has decided to gradually reconstruct the wastewater treatment plant. Our company is overseeing the reconstruction of the biological reactor, which has not yet undergone modernization. When the work is completed, the reactor will be divided into three main parts: denitrification, nitrification and the sedimentation section, including new machine technology equipment, all under our supervision.
Messer Tatragas
Technical Gas Distribution
As an installation partner of Messer Tatragas, we provide technical gas distribution services for our clients. Orders are executed as turnkey projects, including inspections, design, project documentation, approvals from relevant authorities, implementation, pressure tests, official inspections and the preparation of complete accompanying documentation.
We approach both larger and smaller projects with the same level of professionalism because each one is unique to us.
We have all the necessary authorizations for working with designated technical gas and pressure equipment in accordance with current legislation for the execution of these tasks.
Cukrovar Sereď
Sereď Sugar Refinery - Storage and LFO Technological Distribution
The client used natural gas and biogas to operate the steam boiler plant. To ensure an alternative to these energy sources, we implemented a complete system for light fuel oil (LFO) operation. The task was carried out as a turnkey project, starting from project documentation through the design and selection of technological components to the actual work and connection of the steam boilers.
Cukrovar Sereď
Sereď Sugar Refinery - Natural Gas Distribution in a Boiler Room
Supply and installation of a natural gas distribution system, including a control cabinet. Connection of end users. We conducted a pressure test, as with other projects, to demonstrate the quality of the work. At the completion of the work, an authorized inspector carried out the relevant assessment.
Cerová Wastewater Treatment Plant
The village of Cerová is an energetically developing community. In the wastewater treatment plant project for 350 population equivalents (EO) that treats wastewater from three residential buildings and a nearby elementary school, we served as a subcontractor, providing the supply of selected technological components, construction operations and project management for the entire contract.
Compressed Air Testing Equipment - 63 and 132 Bar
The end customer is a manufacturing company that supplies components for air conditioning units. Due to the transition from previously used standard refrigerants to the more environmentally friendly refrigerants used today, it is necessary for these air conditioning units to operate at higher refrigerant pressures. To ensure 100% effectiveness of all products, all manufactured components must undergo pressure testing at the specified pressures. We provided the customer with this requirement as a turnkey solution, using two separate devices for components at 63 bar and 132 bar. We covered the entire project, from the initial design and project documentation to manufacturing the testing equipment, conducting official tests and completing comprehensive accompanying documentation.
Wastewater Treatment Plant - VTSÚ Záhorie
Due to the necessity of renewing the technological equipment and the remediation of the existing wastewater treatment plant's buildings, the customer opted for a complete reconstruction, including intensification. As a subcontractor, we coordinated the entire project, including the supply of total wastewater treatment plant technology, modifications to the biological reactor and pipeline distribution.
BPS Chynorany - Biogas Distribution, Flue Gas Duct and Oil Distribution
On the project to expand the Chynorany biogas station with an additional cogeneration unit, we provided our customer with new biogas distribution, the implementation of a new flue gas duct, and an oil management system. After a leak test, the relevant parts of the pipeline distribution were thermally insulated, including cladding.